CONSTRUCTION
The FRB (FC stack main relay), FRG (FC stack main relay) and FRP (precharge relay) connect and shut off the high voltage circuit output from the FC stack according to relay operation commands from the EV control ECU that are transmitted by the FC DC converter control ECU board sub-assembly.
When the high voltage circuit is connected, the FRB and FRP first turn on, and then the FRG turns on and the FRP turns off. This operation causes current to first flow through the resistor, which protects the circuit from a high voltage inrush current. When the circuit is shut off, the FRG and FRB turn off.