1.INSPECT OIL PMP MTR RELAY
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Battery voltage is not applied to terminal 1 and 2 | 10 MΩ or higher |
| 3 - 5 | Battery voltage is applied to terminal 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the OIL PMP MTR relay.
2.INSPECT P CON MTR RELAY
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Battery voltage is not applied to terminal 1 and 2 | 10 MΩ or higher |
| 3 - 5 | Battery voltage is applied to terminal 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the P CON MTR relay.
3.INSPECT IG2 P RELAY
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Battery voltage is not applied to terminal 1 and 2 | 10 MΩ or higher |
| 3 - 5 | Battery voltage is applied to terminal 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the IG2 P relay.
4.INSPECT LUG-IG1 NO. 1 RELAY
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Battery voltage is not applied to terminal 1 and 2 | 10 MΩ or higher |
| 3 - 5 | Battery voltage is applied to terminal 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the LUG-IG1 No. 1 relay.