Home › Vehicle Interior › LIGHTING (INT) › LIGHTING SYSTEM
RM37H0E _58 Vehicle Interior _095306 LIGHTING (INT) _0448415 LIGHTING SYSTEM J

LIGHTING (INT)  LIGHTING SYSTEM  Push Start Switch Illumination Circuit  


DESCRIPTION

The illuminated entry system controls the push start switch illumination.

WIRING DIAGRAM

E462835E01
3.292,0.719 3.906,0.917 0.615,0.198 10 false SWIL 3.26,1.313 3.875,1.51 0.615,0.198 10 false AGND 3.729,0.708 3.885,0.906 0.156,0.198 10 false 9 3.74,1.323 3.896,1.521 0.156,0.198 10 false 6 4.792,0.698 5.104,0.896 0.313,0.198 10 false 10 4.802,1.323 5.115,1.521 0.313,0.198 10 false 11 5.052,0.698 5.667,0.896 0.615,0.198 10 false SWIL 5.052,1.323 5.667,1.521 0.615,0.198 10 false AGND 1.708,2.01 2.719,2.26 1.01,0.25 10 false D98 5,1.979 6.542,2.5 1.542,0.521 10 false D86 6.125,0.802 6.438,1 0.313,0.198 10 false +B 1.719,2.177 3.104,2.406 1.385,0.229 10 false Power Switch 5.01,2.146 6.552,2.667 1.542,0.521 10 false Certification ECU (Smart Key ECU Assembly)

CAUTION / NOTICE / HINT

NOTICE:

Before replacing the certification ECU (smart key ECU assembly), refer to Service Bulletin.


PROCEDURE

1.PERFORM ACTIVE TEST USING GTS
a.

Perform the Active Test according to the display on the GTS.

Body Electrical > Entry&Start > Active Test
Tester Display Measurement Item Control Range Diagnostic Note
Power/Engine SW Light Power switch illumination OFF or ON -
Body Electrical > Entry&Start > Active Test
Tester Display
Power/Engine SW Light
50004 125 27
OK:

Power switch illumination comes on.



Result:
Proceed to
OK
NG



OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE

NG

2.INSPECT PUSH START SWITCH
2.INSPECT PUSH START SWITCH

Click hereEngine / Hybrid System>STARTING>POWER SWITCH>INSPECTION

Result:
Proceed to
OK
NG



OK

3.CHECK HARNESS AND CONNECTOR (POWER SWITCH - CERTIFICATION ECU [SMART KEY ECU ASSEMBLY])

NG

REPLACE PUSH START SWITCH

3.CHECK HARNESS AND CONNECTOR (POWER SWITCH - CERTIFICATION ECU [SMART KEY ECU ASSEMBLY])
a.

Disconnect the D98 power switch connector.


b.

Disconnect the D86 certification ECU (smart key ECU assembly) connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(D98,D86)Location & Routing

Click Connector(D98)Instrument Panel>Instrument Panel Wire>Power Switch

Click Connector(D86)Instrument Panel>Instrument Panel Wire>Certification ECU

D98-9 (SWIL) - D86-10 (SWIL) Always Below 1 Ω
D98-6 (AGND) - D86-11 (AGND) Always Below 1 Ω
D98-9 (SWIL) or D86-10 (SWIL) - Body ground Always 10 kΩ or higher
D98-6 (AGND) or D86-11 (AGND) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR