Home › HYBRID SYSTEM › P112 HYBRID BATTERY CONTROL › HYBRID BATTERY SYSTEM

HYBRID BATTERY SYSTEM > CHECK FOR INTERMITTENT PROBLEMS

for Preparation Click here



CHECK FOR INTERMITTENT PROBLEMS
  1. Perform a simulation test (Click here).

    1. In the simulation test, reproduce the driving condition when the trouble occurred according to the customer's comments and freeze frame data recorded with DTCs.

  2. Check the connector(s) and terminal(s) (Click here).

  3. Wiggle the harness and connector(s) (Click here).