CIRCUIT OPENING RELAY > ON-VEHICLE INSPECTION |
| 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL |
| 2. INSPECT INTEGRATION RELAY (UNIT C: C/OPN RELAY) |
![]() |
Using a screwdriver, detach the 2 claws and disconnect the integration relay from the No. 1 engine room junction block.
Disconnect the 2 connectors from the integration relay.
![]() |
Measure the resistance between the terminals.
| Tester Connection | Specified Condition |
| 3G-5 - 3G-8 | 10 kΩ or higher |
| 3G-5 - 3G-8 | Below 1 Ω (when battery voltage is applied to terminals 3G-6 and 3G-7) |
Connect the 2 connectors to the integration relay.
Install the integration relay to the engine room No. 1 junction block.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. PERFORM INITIALIZATION |
Perform initialization (Click here).