Home › ENGINE › 1NZ-FXE COOLING › COOLANT HEAT STORAGE WATER PUMP

COOLANT HEAT STORAGE WATER PUMP > INSTALLATION

for Preparation Click here



1. INSTALL COOLANT HEAT STORAGE WATER PUMP


    A087333E01
  1. Install the coolant heat storage pump water pump with the bolt.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }



    A087332E01
  1. Connect the 2 hoses.

  1. Connect the connector to the coolant heat storage pump.



2. CONNECT CABLE TO BATTERY NEGATIVE TERMINAL


3. INSTALL REAR FLOOR NO. 3 BOARD


    A088355E02
  1. Install the floor board, and then attach the 4 claws.



4. INSTALL REAR DECK FLOOR BOX


    A088354E01
  1. Install the rear deck floor box to the vehicle.



5. INSTALL REAR FLOOR NO. 2 BOARD


    A088353E01
  1. Install the floor board, and then lock the 2 cover knobs.



6. ADD ENGINE COOLANT (for Engine)


    C098376E01
  1. Loosen the bleeder plug shown in the illustration and connect a hose.

    NOTICE:
    Insert one end of the hose into the bleeder tank.



    C098377E01
  1. Add coolant until the level of coolant in the hose attached to the bleeder tank reaches the same level as the FULL line of the reserve tank.

    NOTICE:
    Add genuine Toyota Super LLC coolant.

  1. Close the bleeder plug.

  1. Turn the power switch ON (IG) and run the water pump for approximately 20 seconds.

  1. Turn the power switch OFF. (*1)

  1. Loosen the bleeder plug and bleed the air from the transaxle. (*2)

  1. Add coolant into the bleeder tank. (*3)

  1. Repeat the steps *1, *2 and *3.

    Standard:
    Water pump noise becomes softer and coolant circulation in reserve tank improves. Coolant system air bleeding is complete

    HINT:
    If air remains in the coolant system, the water pump noise becomes louder and the coolant circulation in the reserve tank becomes worse.

  1. Turn the power switch ON (IG) and run the water pump for approximately 5 minutes after completing air bleeding of the coolant system.

    NOTICE:
    Ensure that the bleeder plug is closed.



    C098378E01
  1. Add coolant until the reserve tank is filled up to the FULL mark.



7. INSPECT FOR COOLANT LEAK (for Engine)


8. INSTALL FRONT FENDER LINER LH


9. INSTALL ENGINE UNDER COVER LH


10. INSTALL FRONT WHEEL LH

Torque:
103 N*m{ 1050 kgf*cm , 76 ft.*lbf }



11. INSTALL RADIATOR SUPPORT OPENING COVER


    A088174E01
  1. Install the opening cover with the 6 clips.



12. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.