Home › BODY ELECTRICAL › LIGHTING › LIGHTING SYSTEM

LIGHTING SYSTEM > Vehicle Speed Signal Circuit

for Preparation Click here


DESCRIPTION

Headlight beam level control ECU receives the vehicle speed signal from the combination meter.

WIRING DIAGRAM


E115290E25


INSPECTION PROCEDURE

HINT:
Check if the combination meter operation is normal before performing the following procedure.

1.CHECK HEADLIGHT BEAM LEVEL CONTROL ECU (SPEED VOLTAGE)
I102532E01
  1. Measure the voltage of the wire harness side connector.

    Standard voltage:
    Tester Connection
    Tool Setting
    Condition
    Specified Condition
    H12-12 (SPDR) - Body ground
    5 V / DIV., 2 msec. / DIV.
    Vehicle is driving approx. 30 km/h (19 mph)
    0 to 14 V
    Pulse generation
    (See waveform 1 )

    OK:
    Waveform is output as shown in the illustration.



OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
NG


2.CHECK WIRE HARNESS (ECU - METER)
I039983E05
  1. Disconnect the H12 ECU connector.

  1. Disconnect the C10 meter connector.

  1. Measure the resistance of the wire harness side connectors.

    Standard resistance:
    Tester Connection
    Specified Condition
    H12-12 (SPDR) - C10-13
    Below 1 Ω
    H12-12 (SPDR) - Body ground
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

REPLACE COMBINATION METER