Home › BODY ELECTRICAL › LIGHTING › LIGHTING SYSTEM

LIGHTING SYSTEM > Warning Light Circuit

for Preparation Click here


DESCRIPTION

Headlight beam level control ECU sends the warning signal to the combination meter.

WIRING DIAGRAM


E115290E19


INSPECTION PROCEDURE

HINT:
Check if the combination meter operation is normal before performing the following procedure.

1.CHECK HEADLIGHT BEAM LEVEL CONTROL ECU
I039979E06
  1. Disconnect the H12 ECU connector.

  1. Measure the voltage of the wire harness side connector.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    H12-11 (WNG) - Body ground
    Power switch ON (IG)
    10 to 14 V



OK
PROCEED TO NEXT INSPECTION PROCEDURE SHOWN IN PROBLEM SYMPTOMS TABLE
NG


2.CHECK WIRE HARNESS (ECU - METER)
I039983E06
  1. Disconnect the H12 ECU connector.

  1. Disconnect the C10 meter connector.

  1. Measure the resistance of the wire harness side connectors.

    Standard resistance:
    Tester Connection
    Specified Condition
    H12-11 (WNG) - C10-10
    Below 1 Ω
    H12-11 (WNG) - Body ground
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

REPLACE COMBINATION METER