Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING SYSTEM

AIR CONDITIONING SYSTEM > IG Power Source Circuit

for Preparation Click here


DESCRIPTION

This is the main power source supplied to the air conditioning amplifier when the power switch is turned ON (IG). The power source supplied is used for operating the air conditioning amplifier, servo motor, etc.

WIRING DIAGRAM


E125216E02


INSPECTION PROCEDURE

1.INSPECT FUSE (A/C (HTR))
  1. Remove the A/C (HTR) fuse from the driver side junction block.

  1. Measure the resistance of the fuse.

    Standard resistance:
    Below 1 Ω



NG
REPLACE FUSE
OK


2.CHECK AIR CONDITIONING AMPLIFIER (IG VOLTAGE)
I041186E10
  1. Remove the air conditioning amplifier with connectors still connected.

  1. Measure the voltage of the wire harness side connector.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    A8-5 (IG) - A8-1 (GND)
    Power switch ON (IG)
    10 to 14 V



OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
NG


3.CHECK WIRE HARNESS (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)


    E127522E07
  1. Measure the voltage of the wire harness side connector.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    A8-5 (IG) - Body ground
    Power switch ON (IG)
    10 to 14 V

  1. Measure the resistance of the wire harness side connector.

    Standard resistance:
    Tester Connection
    Specified Condition
    A8-1 (GND) - Body ground
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

REPLACE AIR CONDITIONING AMPLIFIER