Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING SYSTEM

AIR CONDITIONING SYSTEM > Back-up Power Source Circuit

for Preparation Click here


DESCRIPTION

This is the back-up power source circuit for the air conditioning amplifier. Power is supplied even when turning the power switch OFF and is used for diagnostic trouble code memory, etc.

WIRING DIAGRAM


E125217E02


INSPECTION PROCEDURE

1.INSPECT FUSE (ECU-B)
  1. Remove the ECU-B fuse from the driver side junction block.

  1. Measure the resistance of the fuse.

    Standard resistance:
    Below 1 Ω



NG
REPLACE FUSE
OK


2.CHECK AIR CONDITIONING AMPLIFIER (+B VOLTAGE)
I041186E11
  1. Remove the air conditioning amplifier with connectors still connected.

  1. Measure the voltage of the wire harness side connector.

    Standard voltage:
    Tester Connection
    Specified Condition
    A8-6 (+B) - Body ground
    10 to 14 V



OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
NG


3.CHECK WIRE HARNESS (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)


    E127522E06
  1. Disconnect the A8 amplifier connector.

  1. Measure the voltage of the wire harness side connector.

    Standard voltage:
    Tester Connection
    Specified Condition
    A8-6 (+B) - Body ground
    10 to 14 V

  1. Measure the resistance of the wire harness side connector.

    Standard resistance:
    Tester Connection
    Specified Condition
    A8-1 (GND) - Body ground
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

REPLACE AIR CONDITIONING AMPLIFIER