AIR CONDITIONING SYSTEM > Heater Water Pump Circuit |

| 1.INSPECT INTEGRATION RELAY (UNIT C: AC W/P) |
![]() |
Remove the integration relay from the engine room junction block.
Measure the resistance of the relay.
| Terminal No. | Specified Condition |
| 3H-4 - 3H-5 | 10 kΩ or higher |
| 3H-4 - 3H-5 | Below 1 Ω (When battery voltage applied to terminals 3H-5 and 3H-3) |
|
| ||||
| OK | |
| 2.CHECK WIRE HARNESS (HYBRID CONTROL ECU - BATTERY) |
![]() |
Install the integration relay.
Disconnect the H16 ECU connectors.
Measure the voltage of the wire harness side connector.
| Tester Connection | Condition | Specified Condition |
| H16-5 (WP) - Body ground | Power switch ON (IG) | 10 to 14 V |
|
| ||||
| OK | |
| 3.CHECK HYBRID CONTROL ECU (WP VOLTAGE) |
![]() |
Measure the voltage of the connector.
| Tester Connection | Condition | Specified Condition |
| H16-5 (WP) - Body ground | Heater water pump not operated | 10 to 14 V |
| H16-5 (WP) - Body ground | Heater water pump operated | Below 1 V |
|
| ||||
| OK | |
| 4.INSPECT HEATER WATER PUMP ASSEMBLY |
![]() |
Remove the heater water pump.
Connect positive (+) lead to terminal 1 of the heater water pump connector and negative (-) lead to terminal 2.
|
| ||||
| OK | ||
| ||