Home › SUSPENSION & AXLE › SUSPENSION › FRONT LOWER BALL JOINT

FRONT LOWER BALL JOINT > INSPECTION

for Preparation Click here



1. INSPECT FRONT LOWER BALL JOINT ASSEMBLY LH


    ZX01712E01
  1. Flip the ball joint stud back and forth 5 times as shown in the illustration before installing the nut.

  1. Use a torque wrench to turn the nut continuously at a rate of 3 to 5 seconds per turn. Take the torque reading on the fifth turn.

    Torque:
    0.98 to 4.90 N*m{ 10 to 50 kgf*cm , 8.7 to 43 in.*lbf }

  1. Check the dust boots for cracks or grease leakage.
    If the value is not within the specified range, replace the lower ball joint with a new one.