Home › ENGINE › 1NZ-FXE STARTING › POWER SWITCH

POWER SWITCH > INSTALLATION

for Preparation Click here



1. INSTALL POWER SWITCH
  1. Install the power switch to the upper finish panel.



2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY


B074046E03
  1. Connect the connector.

  1. Attach the 3 claws and 4 clips to install the instrument panel finish panel.



3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY


B074045E03
  1. Connect the connectors.

  1. Attach the 4 claws and 5 clips to install the instrument panel finish panel.

  1. Connect the hood lock control cable.

  1. Install the 2 screws.



4. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY


B074044E03
  1. Attach the 2 claws and 4 clips to install the instrument panel register.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
  1. When the warning light is illuminated or the battery has been disconnected and reconnected, turning the power switch may not start the system on the first try. If so, turn the power switch again.
  2. With the power switch's power mode changed to ON (IG), disconnect the battery. If the key is not in the key slot during reconnection, DTC B2799 may be output.



    A088356E01
  1. Connect the battery negative cable, and then tighten the nut.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }



6. INSTALL REAR NO. 3 FLOOR BOARD


    A088355E02
  1. Install the floor board, and then attach the 4 claws.



7. INSTALL REAR DECK FLOOR BOX


    A088354E01
  1. Install the rear deck floor box to the vehicle.



8. INSTALL REAR NO. 2 FLOOR BOARD


    A088353E01
  1. Install the floor board, and then lock the 2 cover knobs.



9. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.