PCV VALVE > INSTALLATION |
| 1. INSTALL VENTILATION VALVE |
![]() |
Install the ventilation valve onto the cylinder head cover.
| 2. INSTALL ENGINE WIRE |
![]() |
Install the brake master cylinder reservoir cover to the cylinder head cover.
![]() |
Install the wire harness and brake master cylinder reservoir cover with the 3 bolts.
Connect the fuel injector connector and ignition coil connector.
| 3. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner with the 2 bolts and tighten the clamp.
![]() |
Connect the No. 1 air cleaner inlet to the air cleaner case, and then tighten the clamp.
| 4. INSTALL ENGINE ROOM NO. 2 RELAY BLOCK |
![]() |
Install the relay block with the 2 bolts.
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
![]() |
Connect the battery negative cable, and then tighten the nut.
| 6. INSTALL REAR NO. 3 FLOOR BOARD |
![]() |
Install the floor board, and then attach the 4 claws.
| 7. INSTALL REAR DECK FLOOR BOX |
![]() |
Install the rear deck floor box to the vehicle.
| 8. INSTALL REAR NO. 2 FLOOR BOARD |
![]() |
Install the floor board, and then lock the 2 cover knobs.
| 9. PERFORM INITIALIZATION |
Perform initialization (Click here).