SHIFT LEVER > REMOVAL |
| 1. REMOVE NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY |
![]() |
Detach the 2 claws and 4 clips, and remove the instrument panel register.
| 2. REMOVE LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY |
![]() |
Remove the 2 screws.
Disconnect the hood lock control cable.
Detach the 4 claws and 5 clips.
Disconnect all connectors and remove the instrument panel finish panel.
| 3. REMOVE UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY |
![]() |
Detach the 3 claws and 4 clips.
Disconnect the connector and remove the instrument panel finish panel.
| 4. REMOVE NO. 3 INSTRUMENT PANEL REGISTER ASSEMBLY |
![]() |
Detach the claw and 5 clips.
Disconnect the connector and remove the instrument panel register.
| 5. REMOVE SHIFT LEVER ASSEMBLY |
![]() |
Remove the 3 bolts.
Disconnect the 2 connectors and remove the shift lever.