Home › HYBRID SYSTEM › P112 HYBRID BATTERY CONTROL › BATTERY PLUG

BATTERY PLUG > INSPECTION

for Preparation Click here



1. INSPECT BATTERY PLUG


    A092566E01
  1. Check the resistance.

    1. Measure the resistance between the terminals.

      Standard resistance:
      10 kΩ or higher

      If the result is not as specified, replace the battery plug.



    2. A092575E01
    3. Install the service plug grip to the socket.

    4. Measure the resistance between the terminals.

      Standard resistance:
      Below 1 Ω

      If the result is not as specified, replace the battery plug.