Home › HYBRID SYSTEM › P112 HYBRID BATTERY CONTROL › SYSTEM MAIN RELAY

SYSTEM MAIN RELAY > INSPECTION

for Preparation Click here



1. INSPECT NO. 1 SYSTEM MAIN RELAY


NOTICE:
Connectors B and C have the same shape. Identify each connector by the wire harness length (L) and the wire harness color on the terminal 2 side.
Connector
Wire Harness Length (L)
Wire Harness Color
B
Short
Yellow
C
Long
Black



A131261E01

  1. Check the resistance.

    1. Measure the resistance between the connectors.

      Standard resistance:
      Tester Connection
      Specified Condition
      Positive terminal - Negative terminal
      10 kΩ or higher
      A-2 (CONT2) - B-2 (CONT2)
      Below 1 Ω
      A-3 (CONT3) - C-2 (CONT3)
      Below 1 Ω
      B-1 (GND) - GND
      Below 1 Ω
      C-1 (GND) - GND
      Below 1 Ω

      If the results are not as specified, replace the No. 1 system main relay.

    2. Apply battery voltage between the GND terminal and CONT1 terminal of the connector A, then measure the resistance between the positive and negative terminals.

      Standard resistance:
      Below 1 Ω

      If the results are not as specified, replace the No. 1 system main relay.

  1. Inspect the resistance.

    1. Measure the resistance between the GND terminal and CONT1 terminal of the connector A.

      Standard resistance:
      70 to 160 kΩ

      If the the results are not as specified, replace the No. 1 system main relay.



2. INSPECT NO. 2 SYSTEM MAIN RELAY


    A077579E01
  1. Install the 2 installed nuts to the negative and positive terminals.

    Torque:
    5.6 N*m{ 57 kgf*cm , 50 in.*lbf }

  1. Check the resistance.

    1. Measure the resistance between the positive and negative terminals.

      Standard resistance:
      10 kΩ or higher

      If the result is not as specified, replace the No. 2 system main relay.

    2. Apply battery voltage between the connector terminals, then measure the resistance between the positive and negative terminals.

      Standard resistance:
      Below 1 Ω

      If the result is not as specified, replace the No. 2 system main relay.

  1. Inspect the resistance.

    1. Measure the resistance between the connector terminals.

      Standard resistance:
      20 to 50 kΩ

      If the result is not as specified, replace the No. 2 system main relay.



3. INSPECT NO. 3 SYSTEM MAIN RELAY


    A077579E01
  1. Install the 2 installed nuts to the negative and positive terminals.

    Torque:
    5.6 N*m{ 57 kgf*cm , 50 in.*lbf }

  1. Check the resistance.

    1. Measure the resistance between the positive and negative terminals.

      Standard resistance:
      10 kΩ or higher

      If the result is not as specified, replace the No. 3 system main relay.

    2. Apply battery voltage between the connector terminals, then measure the resistance between the positive and negative terminals.

      Standard resistance:
      Below 1 Ω

      If the result is not as specified, replace the No. 3 system main relay.

  1. Inspect the resistance.

    1. Measure the resistance between the connector terminals.

      Standard resistance:
      20 to 50 kΩ

      If the result is not as specified, replace the No. 3 system main relay.