SYSTEM MAIN RELAY > INSPECTION |
| 1. INSPECT NO. 1 SYSTEM MAIN RELAY |
| Connector | Wire Harness Length (L) | Wire Harness Color |
| B | Short | Yellow |
| C | Long | Black |

Check the resistance.
Measure the resistance between the connectors.
| Tester Connection | Specified Condition |
| Positive terminal - Negative terminal | 10 kΩ or higher |
| A-2 (CONT2) - B-2 (CONT2) | Below 1 Ω |
| A-3 (CONT3) - C-2 (CONT3) | Below 1 Ω |
| B-1 (GND) - GND | Below 1 Ω |
| C-1 (GND) - GND | Below 1 Ω |
Apply battery voltage between the GND terminal and CONT1 terminal of the connector A, then measure the resistance between the positive and negative terminals.
Inspect the resistance.
Measure the resistance between the GND terminal and CONT1 terminal of the connector A.
| 2. INSPECT NO. 2 SYSTEM MAIN RELAY |
![]() |
Install the 2 installed nuts to the negative and positive terminals.
Check the resistance.
Measure the resistance between the positive and negative terminals.
Apply battery voltage between the connector terminals, then measure the resistance between the positive and negative terminals.
Inspect the resistance.
Measure the resistance between the connector terminals.
| 3. INSPECT NO. 3 SYSTEM MAIN RELAY |
![]() |
Install the 2 installed nuts to the negative and positive terminals.
Check the resistance.
Measure the resistance between the positive and negative terminals.
Apply battery voltage between the connector terminals, then measure the resistance between the positive and negative terminals.
Inspect the resistance.
Measure the resistance between the connector terminals.