Home › ENGINE › 1NZ-FXE EMISSION CONTROL › PURGE FLOW SWITCHING VALVE

PURGE FLOW SWITCHING VALVE > INSPECTION

for Preparation Click here



1. INSPECT PRESSURE SWITCHING VALVE


    A132955E01
  1. Inspect the resistance.

    1. Measure the resistance between the terminals.

      Standard resistance:
      Tester Connection
      Specified Condition
      1 - 2
      36 to 42 Ω at 20°C (68°F)
      1 - Valve body
      10 kΩ or higher
      2 - Valve body
      10 kΩ or higher

      1. If the result is not as specified, replace the pressure switching valve.



    A087464E01
  1. Check the ventilation.

    1. Check that there is no ventilation from port E to port F.
      If there is ventilation, replace the pressure switching valve.



    2. A087465E01
    3. Apply battery voltage across the terminals.

    4. Check that there is ventilation from port F when air is applied to port G.
      If there is no ventilation, replace the pressure switching valve.