PURGE FLOW SWITCHING VALVE > INSPECTION |
| 1. INSPECT PRESSURE SWITCHING VALVE |
![]() |
Inspect the resistance.
Measure the resistance between the terminals.
| Tester Connection | Specified Condition |
| 1 - 2 | 36 to 42 Ω at 20°C (68°F) |
| 1 - Valve body | 10 kΩ or higher |
| 2 - Valve body | 10 kΩ or higher |
![]() |
Check the ventilation.
Check that there is no ventilation from port E to port F.
If there is ventilation, replace the pressure switching valve.
![]() |
Apply battery voltage across the terminals.
Check that there is ventilation from port F when air is applied to port G.
If there is no ventilation, replace the pressure switching valve.