Home › STEERING › POWER STEERING › STEERING GEAR

STEERING GEAR > INSPECTION

for Preparation Click here



1. INSPECT TIE ROD END SUB-ASSEMBLY LH
  1. Secure the tie rod end LH boll join in a vise through aluminum plates.

    NOTICE:
    Do not overtighten the vise.

  1. Install the castle nut to the stud bolt.

  1. Flip the ball joint back and forth 5 times or more.

  1. Set a torque wrench to the nut, turn the ball joint continuously at a rate of 3 to 5 seconds per turn, and check the turning torque on the 5th turn.

    Standard turning torque:
    2.0 N*m (20.4 kgf*cm, 18 in. lbf) or less

    If turning torque is out of specification, replace the tie rod end LH with a new one.



2. INSPECT TIE ROD END SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.



3. INSPECT TOTAL PRELOAD


G028296E03
  1. Using SST, inspect the total preload.

    SST
    09616-00011  

    Standard total preload (turning):
    0.6 to 1.2 N*m (6.2 to 12.2 kgf*cm, 5 to 11 in.*lbf)

    NOTICE:
    Inspect around the steering rack center position.

    If the total preload is out of specification, replace the steering gear with a new one.