G92Z0
1.INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
Wear insulated gloves.
Install the hybrid battery junction block assembly with the 3 nuts.
Connect the 4 connectors to the hybrid battery junction block assembly.
The connectors should be connected securely.
Connect the clamp.
G920R
2.INSTALL NO. 2 HYBRID BATTERY SHIELD SUB-ASSEMBLY
Wear insulated gloves.
Install the No. 2 hybrid battery shield sub-assembly with the 5 bolts.
82164
3.CONNECT FRAME WIRE
89892A
4.INSTALL BATTERY SMART UNIT
5. CURRENT SENSOR OFFSET LEARNING
Perform this procedure when the hybrid battery junction block assembly or power management control ECU has been replaced.
Connect the GTS to the DLC3.
Turn the power switch on (READY).
Perform a road test.
Accelerate/decelerate gently. Avoid rapid acceleration/deceleration.
Enter the following menus: Powertrain / Hybrid Control / Data List / Power Resource IB.
Drive the vehicle with the value of Data List item "Power Resource IB" between -50 A and 50 A.
Distance and driving time are not specified.
Turn the power switch off and leave the vehicle for 30 seconds or more.
Turn the power switch on (IG).
Enter the following menus: Powertrain / Hybrid Control / Data List / Power Resource IB.
Check that the value of "Power Resource IB" is between - 0.5 A and 0.5 A with the power switch on (IG).
If the value is outside the specified range, perform the road test again.
If the power switch is on (IG) and value of "Power Resource IB" is between - 0.5 A and 0.5 A, current sensor offset learning has been completed.
Even if the current sensor offset learning is not complete, the current sensor value will be corrected by repeating the road test a maximum of 7 times.