Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › HV RELAY ASSEMBLY
RM2070E _51 Engine / Hybrid System _061906 HYBRID / BATTERY CONTROL _0301584 HV RELAY ASSEMBLY G

HYBRID / BATTERY CONTROL  HV RELAY ASSEMBLY  INSPECTION  


PROCEDURE

Hide G92Z0 1.INSPECT HYBRID BATTERY JUNCTION BLOCK ASSEMBLY

a.

Inspect SMRB

i.
U190686E01
0.092,0.085 0.317,0.283 0.225,0.198 10 *a 2.099,2.997 2.437,3.140 0.338,0.143 10 GND 1.322,2.997 1.766,3.140 0.444,0.143 10 SMRB 2.119,2.726 2.242,2.978 false 1.673,2.726 1.575,2.979 false 0.919,2.545 1.144,2.743 0.225,0.198 10 c6 0.367,1.343 0.615,1.836 false 2.005,1.618 2.230,1.816 0.225,0.198 10 k3 2.112,1.331 2.919,0.536 false 2.958,0.407 3.183,0.605 0.225,0.198 10 + 0.631,1.226 0.856,1.424 0.225,0.198 10 T6 0.492,1.854 0.830,1.997 0.338,0.143 10 CBI

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
k3-1 (+) - T6-1 (CBI)) Auxiliary battery voltage is not applied between terminals c6-4 (SMRB) and c6-2 (GND) 10 kΩ or higher
Auxiliary battery voltage is applied between terminals c6-4 (SMRB) and c6-2 (GND) Below 1 Ω


Text in Illustration
*a Component without harness connected
(Hybrid Battery Junction Block Assembly)


ii.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
c6-4 (SMRB) - c6-2 (GND) -40 to 80°C (-40 to 176°F) 19.0 to 35.5 Ω


If the result is not as specified, replace the hybrid battery junction block assembly.



b.

Inspect SMRG

i.
U190687E01
0.092,0.085 0.317,0.283 0.225,0.198 10 *a 1.703,2.997 2.042,3.140 0.338,0.143 10 GND 2.216,2.997 2.660,3.140 0.444,0.143 10 SMRG 2.291,2.726 2.414,2.978 false 2.051,2.726 1.953,2.979 false 0.968,2.528 1.193,2.725 0.225,0.198 10 c6 0.359,0.742 0.69,1.819 false 2.942,0.782 2.626,0.957 false 0.602,0.795 0.828,0.992 0.225,0.198 10 T5 2.1,0.795 2.326,0.993 0.225,0.198 10 h3 2.979,0.661 3.100,0.858 0.121,0.198 10 - 0.608,1.858 0.946,2.001 0.338,0.143 10 CEI

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
h3-1 (-) - T5-1 (CEI) Auxiliary battery voltage is not applied between terminals c6-1 (SMRG) and c6-2 (GND) 10 kΩ or higher
Auxiliary battery voltage is applied between terminals c6-1 (SMRG) and c6-2 (GND) Below 1 Ω


Text in Illustration
*a Component without harness connected
(Hybrid Battery Junction Block Assembly)


ii.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
c6-1 (SMRG) - c6-2 (GND) -40 to 80°C (-40 to 176°F) 19.0 to 35.5 Ω


If the result is not as specified, replace the hybrid battery junction block assembly.



c.

Inspect SMRP

i.
U190688E01
0.092,0.085 0.317,0.283 0.225,0.198 10 *a 2.117,3.007 2.456,3.150 0.338,0.143 10 GND 1.521,3.007 1.965,3.150 0.444,0.143 10 SMRP 2.117,2.737 2.24,2.989 false 1.877,2.737 1.78,2.99 false 0.968,2.528 1.193,2.725 0.225,0.198 10 c6 0.359,0.742 0.69,1.819 false 2.942,0.782 2.626,0.957 false 0.602,0.795 0.828,0.992 0.225,0.198 10 T5 2.1,0.795 2.326,0.993 0.225,0.198 10 h3 2.979,0.661 3.100,0.858 0.121,0.198 10 - 0.608,1.858 0.946,2.001 0.338,0.143 10 CEI

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
h3-1 (-) - T5-1 (CEI) Auxiliary battery voltage is not applied between terminals c6-3 (SMRP) and c6-2 (GND) 10 kΩ or higher
Auxiliary battery voltage is applied between terminals c6-3 (SMRP) and c6-2 (GND) 28.5 to 31.5 Ω


Text in Illustration
*a Component without harness connected
(Hybrid Battery Junction Block Assembly)
*b Connector (-)
*c Terminal (-)


ii.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
c6-3 (SMRP) - c6-2 (GND) -40 to 80°C (-40 to 176°F) 112 to 274 Ω