SFI SYSTEM > PRECAUTION |
| 1.INITIALIZATION |
| System Name | See Procedure |
| Power Door Lock Control System |
Click here
|
| 2.PRECAUTIONS FOR INSPECTING HYBRID CONTROL SYSTEM |
Before inspecting the high-voltage system or disconnecting the low voltage connector of the inverter with converter assembly, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals.

| 3.NOTICE FOR HYBRID CONTROL SYSTEM ACTIVATION |
When the warning light is illuminated, or the auxiliary battery has been disconnected and reconnected, attempting to turn the ignition switch to ON (READY) may not start the system (the system may not enter the READY-on state) on the first attempt. If so, turn the ignition switch off and reattempt to start the hybrid system.
| 4.WHEN USING TECHSTREAM |
| 5.IGNITION SWITCH EXPRESSIONS |
| Expression | Ignition Switch (Position) | Power Switch (Condition) |
| Ignition switch off | LOCK | Off (Lock) |
| Ignition switch ACC | ACC | On (ACC) |
| Ignition switch ON (IG) | ON (IG) | On (IG) |
| Ignition switch ON (READY) | ON (READY) | On (Ready) |
| 6.COOLING FAN SYSTEM |