Home › Engine / Hybrid System › 1NZ-FXE ENGINE CONTROL › INTEGRATION RELAY

INTEGRATION RELAY > INSTALLATION

for Preparation Click here



1. INSTALL NO. 1 INTEGRATION RELAY
  1. Connect the 3 connectors.

  1. Install the No. 1 integration relay to the engine room relay block.



2. INSTALL NO. 1 RELAY BLOCK COVER