Home › Engine / Hybrid System › 1NZ-FXE EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL LEAK DETECTION PUMP SUB-ASSEMBLY


    A267661
  1. Engage the 2 claws to install a new leak detection pump sub-assembly to the canister.

    NOTICE:
    1. Do not allow foreign matter such as grease, oil or water to adhere to the O-rings.
    2. Ensure that the claws are engaged properly.



2. INSTALL NO. 1 CHARCOAL CANISTER FILTER
  1. Connect the vent hose.

    NOTICE:
    1. Check that there are no scratches or foreign matter around the connected part of the tube connector and pipe before performing this work.
    2. After connecting the vent hose, check that the vent hose is securely connected by pulling on the tube connector and the charcoal canister.

  1. Engage the 2 claws to install the cap.



3. INSTALL CHARCOAL CANISTER PROTECTOR
  1. Install the charcoal canister protector with the clip.



4. INSTALL CHARCOAL CANISTER SUPPORT BRACKET
  1. Install the charcoal canister support bracket with the 2 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



5. INSTALL CHARCOAL CANISTER BASE BRACKET
  1. Install the charcoal canister base bracket with the 4 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



6. INSTALL CHARCOAL CANISTER ASSEMBLY
  1. Install the charcoal canister assembly with the 3 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Connect the vent line tube.

    NOTICE:
    1. Check that there are no scratches or foreign matter around the connected part of the tube connector and pipe before performing this work.
    2. After connecting the air line tube, check that the vent line tube is securely connected by pulling on the tube connector and the charcoal canister.

  1. Connect the purge line hose.

  1. Connect the air line tube.

    NOTICE:
    1. Check that there are no scratches or foreign matter around the connected part of the tube connector and pipe before performing this work.
    2. After connecting the air line tube, check that the air line tube is securely connected by pulling on the tube connector and the charcoal canister.

  1. Connect the connector to the charcoal canister leak detection pump sub-assembly.