Home › Engine / Hybrid System › 1NZ-FXE INTAKE / EXHAUST › INTAKE MANIFOLD

INTAKE MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL INTAKE MANIFOLD
  1. Install a new No. 1 intake manifold to head gasket to the intake manifold.

  1. Install the intake manifold insulator with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the ventilation hose.

  1. Temporarily install the intake manifold and intake manifold stay with the 5 bolts and 2 nuts.



    A268526E01
  1. Tighten the intake manifold with the 3 bolts and 2 nuts.
    Text in Illustration 
    *1
    Bolt
    *2
    Nut

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the fuel vapor feed hose and ventilation hose.



    A267685
  1. Connect the 4 wire harness clamps and water by-pass hose.



2. INSTALL INTAKE MANIFOLD STAY
  1. Tighten the intake manifold stay with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



3. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR
  1. Install the manifold absolute pressure sensor with the bolt.

    Torque:
    7.1 N*m{ 72 kgf*cm , 63 in.*lbf }

  1. Connect the connector.



4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
  1. Install the air cleaner case sub-assembly with the 2 bolts and grommet.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }

  1. Install the air cleaner filter element sub-assembly.



5. INSTALL NO. 2 EGR PIPE


    A268229
  1. Install 2 new gaskets and the No. 2 EGR pipe with the 2 bolts and 2 nuts.

    Torque:
    Bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    Nut:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Make sure to tighten the 4 bolts evenly until the flanges of the EGR pipe assembly contact the installation surfaces.

  1. Connect the clamp and No. 2 water by-pass hose.

  1. Connect the wire harness clamp.



6. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
(Click here)