Home › Vehicle Exterior › EXTERIOR PANELS / TRIM › ROOF DRIP SIDE FINISH MOULDING

ROOF DRIP SIDE FINISH MOULDING > INSTALLATION

for Preparation Click here


HINT:
  1. Use the same procedure for both the RH and LH side.
  2. The procedure described below is for the LH side.



1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

NOTICE:
When installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.

  1. Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.

    HINT:
    Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2) or more (when the temperature is 23°C (73°F))

  1. Press and install the 2 roof drip side finish moulding clips.



    B298013E01
  1. Install 2 new clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

    Standard Measurement:
    Dimension
    Measurement
    a
    2.0 mm (0.0787 in.)
    b
    3.4 mm (0.134 in.)
    c
    3.0 mm (0.118 in.)
    d
    2.0 mm (0.0787 in.)
    e
    4.9 mm (0.193 in.)
    f
    4.0 mm (0.157 in.)

  1. Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing 2 new roof drip side finish moulding clips.

    HINT:
    1. Initial hardening time: 20 minutes
    2. Complete hardening time: 48 hours



2. INSTALL ROOF DRIP SIDE FINISH MOULDING
  1. Engage the 2 clips and install the roof drip side finish moulding.