Home › Engine / Hybrid System › 1NZ-FXE EMISSION CONTROL › CANISTER

CANISTER > INSPECTION

for Preparation Click here



1. INSPECT CHARCOAL CANISTER ASSEMBLY


  1. Visually check the charcoal canister assembly.



      A267653
    1. Visually check the charcoal canister assembly for cracks or damage.
      If cracks or damage are found, replace the charcoal canister assembly.



  1. Check canister operation.



      A267654E01
    1. With port C closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port A, and check that air flows from port B.
      Text in Illustration 
      *a
      Air
      If the result is not as specified, replace the charcoal canister assembly.



    2. A267655E01
    3. With port A closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port B, and check that air flows from port C.
      Text in Illustration 
      *a
      Air
      If the result is not as specified, replace the charcoal canister assembly.



  1. Check for air leaks.



      A267656E01
    1. Connect a pressure gauge to port A of the charcoal canister assembly.
      Text in Illustration 
      *1
      Pressure Gauge

    2. With port C and port B closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into port A, then confirm that pressure is retained for 1 minute.
      If the result is not as specified, replace the charcoal canister assembly.



2. INSPECT NO. 1 CHARCOAL CANISTER FILTER


  1. Visually check the No. 1 charcoal canister filter.



      A267658
    1. Visually check the No. 1 charcoal canister filter for cracks or damage.
      If cracks or damage are found, replace the charcoal canister with bracket assembly.



  1. Check canister operation.



      A267659E01
    1. Blow 0.5 kPa (0.005 kgf/cm2, 0.1 psi) of air into port A, and check that air flows from port B.
      Text in Illustration 
      *a
      Air
      If the result is not as specified, replace the No. 1 charcoal canister filter.



  1. Check for air leaks.



      A267660E01
    1. Connect a pressure gauge to port A of the No. 1 charcoal canister filter.
      Text in Illustration 
      *1
      Pressure Gauge

    2. With port B closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into port A, then confirm that pressure is retained for 1 minute.
      If the result is not as specified, replace the No. 1 charcoal canister filter.



  1. Check the charcoal canister leak detection pump sub-assembly.



      A259522
    1. Connect a positive (+) lead from the auxiliary battery to terminal 5 and a negative (-) lead to terminal 1.

    2. Check that a clicking sound is heard from the leak detection pump.
      If the result is not as specified, replace the charcoal canister leak detection pump sub-assembly.