HYBRID CONTROL SYSTEM > ECU Power Source Circuit |

| 1.CHECK POWER MANAGEMENT CONTROL ECU (+B1, +B2 VOLTAGE) |
Turn the ignition switch to ON (IG).
![]() |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| A39-5 (+B1) - Body ground | Ignition switch ON (IG) | 11 to 14 V |
| A38-2 (+B2) - Body ground | Ignition switch ON (IG) | 11 to 14 V |
| *a | Component with harness connected (Power Management Control ECU) |
Turn the ignition switch off.
|
| ||||
| OK | |
| 2.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND) |
Disconnect connector G57 and G58 from the power management control ECU.
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| G57-5 (E01) - Body ground | Always | Below 1 Ω |
| G57-6 (E1) - Body ground | Always | Below 1 Ω |
| G58-5 (E02) - Body ground | Always | Below 1 Ω |
| *a | Rear view of wire harness connector (to Power Management Control ECU) |
Connect the power management control ECU connectors.
|
| ||||
| OK | ||
| ||
| 3.CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE) |
Turn the ignition switch to ON (IG).
![]() |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| A39-6 (MREL) - Body ground | Ignition switch ON (IG) | 11 to 14 V |
| *a | Component with harness connected (Power Management Control ECU) |
|
| ||||
| OK | |
| 4.CHECK FUSE (IGCT NO. 2) |
![]() |
Remove the IGCT NO. 2 fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| IGCT NO. 2 fuse terminals | Always | Below 1 Ω |
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT NO. 2 Fuse |
Install the IGCT NO. 2 fuse.
|
| ||||
| OK | |
| 5.CHECK FUSE (IGCT-MAIN) |
![]() |
Remove the IGCT-MAIN fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| IGCT-MAIN fuse terminals | Always | Below 1 Ω |
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT-MAIN Fuse |
Install the IGCT-MAIN fuse.
|
| ||||
| OK | |
| 6.INSPECT RELAY (IGCT) |
Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 3 - 5 | Auxiliary battery voltage is not applied between terminals 1 and 2 | 10 kΩ or higher |
| Auxiliary battery voltage is applied between terminals 1 and 2 | Below 1 Ω |
| *1 | IGCT Relay |
Install the IGCT relay.
|
| ||||
| OK | |
| 7.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY) |
Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.
Disconnect connector A38 and A39 from the power management control ECU.
Measure the resistance according to the value(s) in the table below.

| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly | *2 | IGCT Relay |
| *a | Rear view of wire harness connector (to Power Management Control ECU) | - | - |
| Tester Connection | Condition | Specified Condition |
| A39-5 (+B1) - 5 (IGCT relay) | Always | Below 1 Ω |
| A38-2 (+B2) - 5 (IGCT relay) | Always | Below 1 Ω |
Install the IGCT relay.
Connect the power management control ECU connectors.
|
| ||||
| OK | |
| 8.CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY) |
Remove the IGCT MAIN fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 3 (IGCT relay) - 2 (IGCT MAIN fuse) | Always | Below 1 Ω |
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT Relay |
| *3 | IGCT MAIN Fuse |
Install the IGCT MAIN fuse.
Install the IGCT relay.
|
| ||||
| OK | |
| 9.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY) |
Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.
Disconnect connector A39 from the power management control ECU.
Measure the resistance according to the value(s) in the table below.

| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly | *2 | IGCT Relay |
| *a | Rear view of wire harness connector (to Power Management Control ECU) | - | - |
| Tester Connection | Condition | Specified Condition |
| A39-6 (MREL) - 1 (IGCT relay) | Always | Below 1 Ω |
| A39-6 (MREL) or 1 (IGCT relay) - Body ground and other terminals | Always | 10 kΩ or higher |
Install the IGCT relay.
Connect the power management control ECU connectors.
|
| ||||
| OK | |
| 10.CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY - BODY GROUND) |
Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 2 (IGCT relay) - Body ground | Always | Below 1 Ω |
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT Relay |
Install the IGCT relay.
|
| ||||
| OK | ||
| ||
| 11.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY) |
Disconnect connector C23 from the shift lever position sensor.
Remove the IGCT NO. 2 fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
Disconnect connectors A38 and A39 from the power management control ECU.
Measure the resistance according to the value(s) in the table below.

| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly | *2 | IGCT NO. 2 Fuse |
| *a | Rear view of wire harness connector (to Power Management Control ECU) | - | - |
| Tester Connection | Condition | Specified Condition |
| A39-5 (+B1) or 2 (IGCT NO. 2 fuse) - Body ground and other terminals | Always | 10 kΩ or higher |
| A38-2 (+B2) or 2 (IGCT NO. 2 fuse) - Body ground and other terminals | Always | 10 kΩ or higher |
Install the IGCT NO. 2 fuse.
Connect the shift lever position sensor connector.
Connect the power management control ECU connectors.
|
| ||||
| OK | ||
| ||
| 12.CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY) |
![]() |
Remove the IGCT MAIN fuse, IGCT NO. 2 fuse, IGCT NO. 3 fuse and PCU fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT MAIN Fuse |
| *3 | IGCT NO. 2 Fuse |
| *4 | PCU Fuse |
| *5 | IGCT NO. 3 Fuse |
Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 3 (IGCT relay) or 2 (IGCT MAIN fuse) - Body ground and other terminals | Always | 10 kΩ or higher |
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT Relay |
| *3 | IGCT MAIN Fuse |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 5 (IGCT relay) or 2 (IGCT NO. 2 fuse) - Body ground and other terminals | Always | 10 kΩ or higher |
| *1 | No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly |
| *2 | IGCT Relay |
| *3 | IGCT NO. 2 Fuse |
Install the IGCT MAIN fuse, IGCT NO. 2 fuse, IGCT NO. 3 fuse and PCU fuse.
Install the IGCT relay.
|
| ||||
| OK | ||
| ||
| 13.REPAIR OR REPLACE HARNESS OR CONNECTOR |
| NEXT | ||
| ||
| 14.REPAIR OR REPLACE HARNESS OR CONNECTOR |
| NEXT | ||
| ||