Home › Engine / Hybrid System › 2ZR-FXE ENGINE CONTROL › INTEGRATION RELAY

INTEGRATION RELAY > REMOVAL

for Preparation Click here



1. REMOVE NO. 1 RELAY BLOCK COVER
  1. Remove the No. 1 relay block cover.



2. REMOVE INTEGRATION NO.2 RELAY


    A212309
  1. Using a screwdriver with its tip wrapped in protective tape, disengage the 2 claws and disconnect the integration relay.



    A212310
  1. Disconnect the 3 connectors and remove the integration relay.