Home › Engine / Hybrid System › 2ZR-FXE ENGINE CONTROL › ECM

ECM > INSTALLATION

for Preparation Click here



1. INSTALL ECM


    A212307
  1. Install the ECM with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



    A212306
  1. Install the 2 wire harness clamps.



  1. Connect the 2 ECM connectors.



      A216692
    1. Connect the 2 ECM connectors and lower the 2 levers.

      NOTICE:
      1. When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
      2. Make sure that the 2 levers are securely locked.

    2. Install the 2 wire harness clamps.



    A212303
  1. Install the No. 2 engine room wire with the bolt.

    Torque:
    8.3 N*m{ 85 kgf*cm , 73 in.*lbf }



    A214454
  1. Slide the side cover down and engage the 2 claws to install it.



    A214453
  1. Slide the engine room wire harness down and engage the 2 claws to install it.



    A212300
  1. Connect the 3 wire harness connectors.

  1. Install the No. 1 relay block cover.



2. INSTALL RADIATOR WITHOUT CAP RESERVE TANK ASSEMBLY


    A212304
  1. Install the radiator without cap reserve tank assembly with the 2 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).



4. INSTALL REAR NO. 3 FLOOR BOARD


    B227791
  1. Engage the 2 guides to install the rear No. 3 floor board.



5. INSTALL REAR DECK FLOOR BOX
  1. Install the rear deck floor box.



6. INSTALL REAR NO. 2 FLOOR BOARD


    B227788E01
  1. Engage the 3 guides <A>.

  1. Engage the 2 guides <B> and install the rear No. 2 floor board as shown in the illustration.



7. PERFORM INITIALIZATION

HINT:
Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) battery terminal.

  1. Perform Initialization when replacing the ECM .