PURGE VALVE > INSTALLATION |
| 1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY |
![]() |
Install the vacuum switching valve assembly with the bolt.
![]() |
Connect the 2 fuel vapor feed hoses and connector to the vacuum switching valve assembly.
Connect the No. 1 vacuum switching valve connector.
| 2. INSTALL AIR CLEANER CASE |
![]() |
Install the air cleaner case with the 3 bolts.
Install the hose to the 3 hose clamps.
Install the air cleaner filter element.
| 3. INSTALL INLET AIR CLEANER ASSEMBLY |
![]() |
Install the inlet air cleaner assembly with the 2 bolts.
| 4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
![]() |
Install the air cleaner cap sub-assembly with the 2 clamps.
Tighten the hose clamp.
![]() |
Connect the mass air flow meter connector.
| 5. INSTALL NO. 2 CYLINDER HEAD COVER |
![]() |
Engage the 3 clips to install the cover.