BATTERY > INSTALLATION |
| 1. INSTALL AUXILIARY BATTERY |
Install the battery.
![]() |
Connect the battery ventilation hose to the battery without kinking it.
![]() |
Install the battery clamp with the bolt and nut.
Install the battery thermometer sensor connector
![]() |
Connect the positive (+) battery terminal with the nut.
Install the battery terminal cap.
![]() |
Engage the 2 claws to install the No. 3 rear floor board plate upper.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 3. INSTALL REAR NO. 3 FLOOR BOARD |
![]() |
Engage the 2 guides to install the rear No. 3 floor board.
| 4. INSTALL REAR DECK FLOOR BOX |
Install the rear deck floor box.
| 5. INSTALL REAR NO. 2 FLOOR BOARD |
![]() |
Engage the 3 guides <A>.
Engage the 2 guides <B> and install the rear No. 2 floor board as shown in the illustration.