Home › Power Source / Network › 2ZR-FXE BATTERY / CHARGING › BATTERY

BATTERY > INSTALLATION

for Preparation Click here



1. INSTALL AUXILIARY BATTERY
  1. Install the battery.



    A215212
  1. Connect the battery ventilation hose to the battery without kinking it.

    HINT:
    Push in the battery ventilation hose to the battery until a click sound is heard.



    A215211
  1. Install the battery clamp with the bolt and nut.

    Torque:
    Nut:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
    Bolt:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. Install the battery thermometer sensor connector



    A215210E02
  1. Connect the positive (+) battery terminal with the nut.

  1. Install the battery terminal cap.



    A216887
  1. Engage the 2 claws to install the No. 3 rear floor board plate upper.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).



3. INSTALL REAR NO. 3 FLOOR BOARD


    B227791
  1. Engage the 2 guides to install the rear No. 3 floor board.



4. INSTALL REAR DECK FLOOR BOX
  1. Install the rear deck floor box.



5. INSTALL REAR NO. 2 FLOOR BOARD


    B227788E01
  1. Engage the 3 guides <A>.

  1. Engage the 2 guides <B> and install the rear No. 2 floor board as shown in the illustration.