Home › Engine / Hybrid System › 2ZR-FXE ENGINE MECHANICAL › ENGINE UNIT

ENGINE UNIT > INSTALLATION

for Preparation Click here



1. INSTALL IGNITION COIL ASSEMBLY


    A212292
  1. Install the 4 ignition coils with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    When installing each ignition coil, do not damage the plug cap on the engine head cover opening or the upper edge of the spark plug tube.

  1. Connect the 4 ignition coil connectors.



2. INSTALL VENTILATION HOSE


    A215741
  1. Install the ventilation hose to the ventilation valve.



3. INSTALL EXHAUST MANIFOLD


    A212650
  1. Install 2 new gaskets and the exhaust manifold with the 7 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



4. INSTALL MANIFOLD STAY


    A212649
  1. Install the manifold stay with the 3 bolts.

    Torque:
    43 N*m{ 440 kgf*cm , 32 ft.*lbf }



5. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR


    A212648
  1. Install the No. 1 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



6. INSTALL FUEL INJECTOR ASSEMBLY


    A153011E06
  1. Install a new insulator and O-ring to each fuel injector assembly.
    Text in Illustration 
    *1
    O-ring
    *2
    Insulator

  1. Apply a light coat of gasoline or spindle oil to the contact surfaces of the new O-ring on each fuel injector assembly.



    A173350
  1. While turning the fuel injector assembly left and right, install it onto the fuel delivery pipe sub-assembly.

    NOTICE:
    1. Do not damage the fuel injector assembly or O-ring.
    2. Do not twist the O-ring.
    3. After installing each fuel injector, check that it turns smoothly. If not, replace the O-ring with a new one.



7. INSTALL NO. 1 DELIVERY PIPE SPACER


    A216401
  1. Install the 2 No. 1 delivery pipe spacers onto the cylinder head.

    NOTICE:
    Install the No. 1 delivery pipe spacers in the correct direction.



8. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY


    A216400
  1. Install the fuel delivery pipe sub-assembly with the 4 fuel injector assemblies and install the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    1. Do not drop the fuel injectors when installing the fuel delivery pipe sub-assembly.
    2. Check that the fuel injector assemblies rotate smoothly after installing the fuel delivery pipe sub-assembly.



    A216399
  1. Install the bolt to secure the fuel delivery pipe sub-assembly.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



9. INSTALL FUEL VAPOR FEED PIPE


    A218073
  1. Install the fuel vapor feed pipe with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



10. INSTALL INTAKE MANIFOLD
  1. Install a new No. 1 intake manifold to head gasket to the intake manifold.



    A212684
  1. Install the intake manifold with the 2 bolts and 2 nuts.

    Torque:
    28 N*m{ 285 kgf*cm , 21 ft.*lbf }



    A212683
  1. Connect the fuel vapor feed hose and ventilation hose.

  1. Install a new O-ring to the engine oil level dipstick guide sub-assembly.

  1. Apply a light coat of engine oil to the O-ring.



    A212681E01
  1. Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.

    Torque:
    Bolt (A):
    28 N*m{ 285 kgf*cm , 21 ft.*lbf }
    Bolt (B):
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the engine oil level dipstick.



    A212682
  1. Connect the 2 wire harness clamps and 3 connectors.



11. INSTALL EGR WITH COOLER PIPE SUB-ASSEMBLY


    A218078E01
  1. Temporarily install the EGR cooler sub-assembly with the 2 nuts (A and B).
    Text in Illustration 
    *1
    Bolt
    *2
    Stud Bolt and Nut

  1. Set a new gasket and EGR valve with cooler assembly.

  1. Using an E8 "TORX" wrench, install the 4 stud bolts.

    Torque:
    9.5 N*m{ 97 kgf*cm , 84 in.*lbf }

  1. Temporarily install the 2 nuts (C) and bolt.

  1. Tighten the nut (A).

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the 3 nuts (B and C) and bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Make sure that all installation surfaces of the EGR valve with cooler assembly are in even contact when tightening the bolts and nuts.



    A212666
  1. Connect the connector, wire harness clamp and 4 water hoses.



12. INSTALL EGR VALVE ASSEMBLY


    A218077E01
  1. Temporarily install the EGR valve assembly with the 2 nuts (A and B).
    Text in Illustration 
    *1
    Bolt
    *2
    Stud Bolt and Nut

  1. Set a new gasket and EGR valve with cooler assembly.

  1. Using an E8 "TORX" wrench, install the 4 stud bolts.

    Torque:
    9.5 N*m{ 97 kgf*cm , 84 in.*lbf }

  1. Temporarily install the 2 nuts (C) and bolt.

  1. Tighten the nut (A).

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the 3 nuts (B and C) and bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Make sure that all installation surfaces of the EGR valve with cooler assembly are in even contact when tightening the bolts and nuts.



    A212666
  1. Connect the connector, wire harness clamp and 4 water hoses.



13. INSTALL EGR PIPE ASSEMBLY


    A212665
  1. Install 2 new gaskets and EGR pipe assembly with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Make sure to tighten the 4 bolts evenly until the flanges of the EGR pipe assembly contact with the installation surfaces.



    A212664
  1. Install the wire harness support with the bolt.



    A212663
  1. Connect the 2 wire harness clamps.



14. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the engine oil level dipstick guide.



    A213046E01
  1. Install the engine oil level dipstick guide with the 2 bolts.

    Torque:
    Bolt A:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }
    Bolt B:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the clamp to the engine oil level dipstick guide.

  1. Install the oil dipstick.



15. INSTALL THROTTLE BODY ASSEMBLY


    A212317
  1. Install a new gasket onto the intake manifold.



    A212316
  1. Install the throttle body assembly with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 2 water by-pass hoses and throttle body connector.



16. INSTALL ENGINE HANGERS


    A214905
  1. Install the 2 engine hangers with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

    Part Name
    Part No.
    No. 1 engine hanger
    12281-37021
    No. 2 engine hanger
    12282-37011
    Bolt
    91552-81050



17. REMOVE ENGINE ON ENGINE STAND
  1. Remove the bolts and engine on engine stand.