INTEGRATION RELAY > INSTALLATION |
| 1. INSTALL NO. 1 INTEGRATION RELAY |
![]() |
Connect the 3 connectors.
![]() |
Engage the 2 claws to install the No. 1 integration relay as shown in the illustration.
| 2. INSTALL NO. 1 RELAY BLOCK COVER |
![]() |
Engage the 3 claws to install the No. 1 relay block cover.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |