AIRBAG CUT-OFF SWITCH > INSTALLATION |
| 1. INSTALL AIRBAG CUT-OFF SWITCH CYLINDER SUB-ASSEMBLY |
![]() |
Engage the 2 claws to install the airbag cut-off switch cylinder sub-assembly.
| 2. INSTALL INSTRUMENT PANEL FINISH PANEL END RH |
![]() |
Engage the guide as shown in the illustration.
![]() |
Engage the guide as shown in the illustration.
![]() |
Engage the 4 claws to install the instrument panel finish panel end RH.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. INSTALL REAR NO. 3 FLOOR BOARD |
![]() |
Engage the 2 guides to install the rear No. 3 floor board.
| 5. INSTALL REAR DECK FLOOR BOX |
Install the rear deck floor box.
| 6. INSTALL REAR NO. 2 FLOOR BOARD |
![]() |
Engage the 3 guides <A>.
Engage the 2 guides <B> and install the rear No. 2 floor board as shown in the illustration.
| 7. PERFORM DIAGNOSTIC SYSTEM CHECK |
Perform a diagnostic system check (Click here).
| 8. INSPECT SRS WARNING LIGHT |
Inspect the SRS warning light (Click here).