METER / GAUGE SYSTEM > INITIALIZATION |
| MAINTENANCE REQUIRED REMINDER RESETTING PROCEDURE |
Turn the power switch on (IG).
Press the ODO/TRIP change switch until the TRIP A meter appears.
Turn the power switch off.
Turn the power switch on (IG) while pressing and holding the unit change switch. Hold the unit change switch until the following conditions are met and 5 seconds have elapsed.
The TRIP A meter shows "000000".
The multi-information display shows that the reset is complete.