CANISTER > INSTALLATION |
| 1. INSTALL CHARCOAL CANISTER ASSEMBLY |
![]() |
Install the charcoal canister assembly with the 3 bolts and clip.
![]() |
Connect the air inlet line tube, connector, tube clamp and wire harness clamp.
![]() |
Connect the vent line tube.
Connect the pipe to the fuel tube connector, as shown in A in the illustration. Then push up the retainer to lock the claws, as shown in B in the illustration.
Connect the purge line hose and tube clamp.
| 2. INSTALL REAR FLOOR STEP UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover) |
![]() |
Connect the 3 clips (B).
Install the rear floor step under cover sub-assembly with the nut and 5 clips (A).
| 3. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL |
| 4. INSTALL REAR NO. 3 FLOOR BOARD |
![]() |
Engage the 2 guides to install the rear No. 3 floor board.
| 5. INSTALL REAR DECK FLOOR BOX |
Install the rear deck floor box.
| 6. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) |
![]() |
Engage the 3 guides <A>.
Engage the 2 guides <B> and install the rear No. 2 floor board as shown in the illustration.