Home › Engine / Hybrid System › 2ZR-FXE EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CHARCOAL CANISTER ASSEMBLY


    A212662
  1. Install the charcoal canister assembly with the 3 bolts and clip.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



    A212661
  1. Connect the air inlet line tube, connector, tube clamp and wire harness clamp.



    A215702E01
  1. Connect the vent line tube.

    1. Connect the pipe to the fuel tube connector, as shown in A in the illustration. Then push up the retainer to lock the claws, as shown in B in the illustration.

      NOTICE:
      1. Check that there are no scratches or foreign matter around the connected parts of the vent line tube connector and pipe before performing this work.
      2. After connecting the vent line tube, check that the vent line tube is securely connected by pulling the vent line tube connector and pipe.

  1. Connect the purge line hose and tube clamp.



2. INSTALL REAR FLOOR STEP UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover)


    A212659E01
  1. Connect the 3 clips (B).

  1. Install the rear floor step under cover sub-assembly with the nut and 5 clips (A).



3. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL


4. INSTALL REAR NO. 3 FLOOR BOARD


    B227791
  1. Engage the 2 guides to install the rear No. 3 floor board.



5. INSTALL REAR DECK FLOOR BOX
  1. Install the rear deck floor box.



6. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type)


    B227788E01
  1. Engage the 3 guides <A>.

  1. Engage the 2 guides <B> and install the rear No. 2 floor board as shown in the illustration.