Home › Engine / Hybrid System › 2ZR-FXE STARTING › POWER SWITCH

POWER SWITCH > REMOVAL

for Preparation Click here



1. REMOVE REAR NO. 2 FLOOR BOARD (for Separate Type)


    B227787E01
  1. Disengage the 2 guides <A> as shown in the illustration.

  1. Disengage the 3 guides <B> and remove the rear No. 2 floor board.



2. REMOVE REAR DECK FLOOR BOX
  1. Remove the rear deck floor box.



3. REMOVE REAR NO. 3 FLOOR BOARD


    B227791
  1. Disengage the 2 guides and remove the rear No. 3 floor board.



4. DISCONNECT CABLE FROM AUXILIARY BATTERY NEGATIVE TERMINAL


5. REMOVE INTEGRATION CONTROL AND PANEL ASSEMBLY


    B223452E01
  1. Using a moulding remover, slightly lift the panel at the position shown in the illustration.
    Text in Illustration 
    *a
    Lift slightly

  1. Pull the integration control and panel assembly in the direction indicated by the arrow to disengage the 6 claws.

  1. Disconnect each connector and remove the integration control and panel assembly.



6. REMOVE LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


    B223454
  1. Pull the lower center instrument cluster finish panel sub-assembly in the direction indicated by the arrow to disengage the 2 claws and 2 clips.



    B223455
  1. Pull the lower center instrument cluster finish panel sub-assembly in the direction indicated by the arrow to disengage the 5 claws and remove the lower center instrument cluster finish panel sub-assembly.



7. REMOVE INSTRUMENT CLUSTER FINISH PANEL GARNISH
  1. Disengage the 14 claws.



  1. Disconnect the connector and remove the instrument cluster finish panel garnish.


    B223458



8. REMOVE UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY


    B223459
  1. Disengage the 3 claws.

  1. Disconnect the connector and remove the upper instrument panel finish panel sub-assembly.



9. REMOVE POWER SWITCH


    A216893
  1. Disengage the 2 claws and remove the power switch.