FRONT BLOWER MOTOR > INSTALLATION |
| 1. PRECAUTION (w/ Solar Ventilation System) |
| 2. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY (w/o Solar Ventilation System) |
![]() |
Install the front blower motor sub-assembly with the 3 screws.
Engage the clamp and connect the connector.
Install the quick heater connector screw.
| 3. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY (w/ Solar Ventilation System) |
![]() |
Install the front blower motor sub-assembly with the 3 screws.
Engage the clamp and connect the connector.
Install the quick heater connector screw.
| 4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY |
Connect each connector.
Engage the guide and 3 claws to install the No. 2 instrument panel under cover sub-assembly.