LIGHTING SYSTEM > Front Fog Light Circuit |

| 1.CHECK OPERATION (TAILLIGHTS) |
Check the operation of the taillights.
|
| ||||
| OK | |
| 2.PERFORM ACTIVE TEST USING INTELLIGENT TESTER |
Connect the intelligent tester to the DLC3.
Turn the power switch on (IG).
Turn the intelligent tester on.
Enter the following menus: Body / Main Body / Active Test.
Perform the Active Test according to the display on the intelligent tester.
| Tester Display | Test Part | Control Range | Diagnostic Note |
| Front Fog Light Relay | Front fog light relay | ON/OFF | Light control switch is in tail position |
|
| ||||
| OK | ||
| ||
| 3.CHECK HARNESS AND CONNECTOR (FOG LIGHT ASSEMBLY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY AND BODY GROUND) |
Disconnect the A12 fog light assembly LH connector.
Disconnect the A63*1 or A11*2 fog light assembly RH connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A12-2 - 3C-7 | Always | Below 1 Ω |
| A63-2*1 - 3C-7 | Always | Below 1 Ω |
| A11-2*2 - 3C-7 | Always | Below 1 Ω |
| 3C-7 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 4.INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY |
Remove the instrument panel junction block assembly (Click here).
![]() |
Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Connect a positive (+) lead from the auxiliary battery to terminal 3E-1*1 or 3F-1*2.
Connect a negative (-) lead from the auxiliary battery to terminal MB-14 (TRLY) and MB-13 (FFGO).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 3C-7 - Body ground | Always | 11 to 14 V |
| *A | for LHD |
| *B | for RHD |
| *a | Component without harness connected (Instrument Panel Junction Block Assembly) |
|
| ||||
| OK | ||
| ||