Home
›
Engine / Hybrid System
›
1NZ-FXE ENGINE CONTROL
›
INTEGRATION RELAY
INTEGRATION RELAY > INSTALLATION
for Preparation
Click here
1. INSTALL NO. 1 INTEGRATION RELAY
Connect the 3 connectors.
Install the No. 1 integration relay to the engine room relay block.
2. INSTALL NO. 1 RELAY BLOCK COVER