Home › Vehicle Exterior › LIGHTING (EXT) › AUTOMATIC HEADLIGHT BEAM LEVEL CONTROL SYSTEM

AUTOMATIC HEADLIGHT BEAM LEVEL CONTROL SYSTEM > Indicator Circuit

for Preparation Click here


DESCRIPTION

The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the power switch is turned on (IG). The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.

WIRING DIAGRAM


E223772E03


INSPECTION PROCEDURE

1.CHECK HEADLIGHT LEVELING ECU ASSEMBLY (INPUT SIGNAL)
  1. Disconnect the A34 headlight leveling ECU assembly connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    A34-6 (WNG) - Body ground
    Power switch on (IG)
    11 to 14 V
    Power switch off
    Below 1 V



NG
Go to step 2
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)  

2.CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)
  1. Disconnect the G1 combination meter assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A34-6 (WNG) - G1-23 (LVWG)
    Always
    Below 1 Ω
    A34-6 (WNG) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE COMBINATION METER ASSEMBLY (Click here)