Home › Engine / Hybrid System › 1NZ-FXE ENGINE MECHANICAL › CYLINDER HEAD GASKET

CYLINDER HEAD GASKET > INSTALLATION

for Preparation Click here


HINT:
Perform "Inspection After Repairs" after replacing the cylinder head sub-assembly (Click here).



1. INSPECT CYLINDER HEAD SET BOLT


    A199982E06
  1. Using a vernier caliper, measure the length of the cylinder head set bolts from the seat to the end.
    Text in Illustration 
    *a
    Length

    Standard length:
    142.8 to 144.2 mm (5.62 to 5.68 in.)

    Maximum length:
    147.1 mm (5.79 in.)

    If the length is greater than the maximum, replace the cylinder head set bolt.



2. INSTALL CYLINDER HEAD GASKET


    A265783E01
  1. Apply seal packing to a new cylinder head gasket as shown in the illustration.
    Text in Illustration 
    *1
    Cylinder Head Gasket
    *a
    Apply Seal Packing To The Inner Corners
    *b
    4.5 to 5.5 mm (0.177 to 0.217 in.)
    V100145
    Seal Packing Black

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    Install the cylinder head sub-assembly within 3 minutes and tighten the cylinder head bolts within 15 minutes after applying seal packing.



    A267001E01
  1. Place the cylinder head gasket on the cylinder block with the Lot No. facing upward.
    Text in Illustration 
    *a
    Lot Number

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Be careful of the installation direction.



3. INSTALL CYLINDER HEAD SUB-ASSEMBLY

HINT:
  1. Perform "Inspection After Repairs" after replacing the cylinder head sub-assembly (Click here).
  2. The cylinder head bolts are tightened in 2 progressive steps.

  1. Place the cylinder head sub-assembly on the cylinder block.

    NOTICE:
    1. Ensure that no oil is on the mounting surface of the cylinder head sub-assembly.
    2. Place the cylinder head sub-assembly gently in order not to damage the cylinder head gasket.

  1. Apply a light coat of engine oil to the threads and under the heads of the 10 cylinder head bolts.

    NOTICE:
    Ensure that no engine oil drips from any of the cylinder head bolts.



  1. Step 1:



      A267008E02
    1. Using several steps, uniformly install and tighten the 10 cylinder head bolts and 10 washers with an 8 mm bi-hexagon wrench in the order shown in the illustration.

      Torque:
      29 N*m{ 300 kgf*cm , 22 ft.*lbf }



  1. Step 2:



      A268868E01
    1. Mark each cylinder head bolt head with paint as shown in the illustration.
      Text in Illustration 
      *a
      Paint Mark
      V100135
      Engine Front

    2. Further tighten the cylinder head bolts 90°, and then an additional 90° as shown in the illustration.

  1. Check that the paint mark is now at a 180° angle to the front.

  1. After tightening the cylinder head bolts, wipe off the seal packing material that seeped out from the contact surface between the cylinder head sub-assembly and cylinder block.



4. INSTALL CAMSHAFT
  1. Apply a light coat of engine oil to the camshaft and cylinder head sub-assembly journals.



    A268218E01
  1. Place the camshaft and No. 2 camshaft on the cylinder head sub-assembly with the timing mark on the camshaft timing gear assembly and camshaft timing sprocket facing upward.
    Text in Illustration 
    *a
    Timing Mark
    *b
    Timing Mark (Rectangle)
    *c
    Mark (Circle)

    HINT:
    There are 3 marks on the camshaft timing sprocket. Make sure that the timing mark (rectangle) is at the top.



    A268219E01
  1. Check the front marks and numbers on the No. 1 camshaft bearing cap and 8 No. 2 camshaft bearing caps, then temporarily install them with the 19 bolts.
    Text in Illustration 
    *1
    No. 1 Camshaft Bearing Cap
    *2
    No. 2 Camshaft Bearing Cap

  1. Uniformly tighten the 19 bolts in the sequence shown in the illustration.

    Torque:
    No. 2 camshaft bearing cap:
    13 N*m{ 129 kgf*cm , 9 ft.*lbf }
    No. 1 camshaft bearing cap:
    23 N*m{ 234 kgf*cm , 17 ft.*lbf }

    NOTICE:
    Uniformly tighten the bolts while keeping the camshaft level.



5. INSTALL CHAIN SUB-ASSEMBLY


    A265768E01
  1. Set the crankshaft in the position shown in the illustration.
    Text in Illustration 
    *a
    Timing Mark

    HINT:
    The crankshaft will be set to 90° ATDC and the timing mark will be at the location shown in the illustration.



    A265769E01
  1. Set the camshaft timing gear assembly and camshaft timing sprocket in the positions shown in the illustration.
    Text in Illustration 
    *a
    Timing Mark
    *b
    Timing Mark (Rectangle)
    *c
    Mark (Circle)

    HINT:
    There are 3 marks on the camshaft timing sprocket. Make sure to set the timing mark (rectangle) to 10° as shown in the illustration. Make sure to set the camshaft timing gear assembly to 10° as shown in the illustration. This is the location of the camshafts when the crankshaft is 20° ATDC.



    A265770E01
  1. Set the crankshaft in the position shown in the illustration.
    Text in Illustration 
    *a
    Timing Mark

    HINT:
    The crankshaft will be set to 20° ATDC and the timing mark will be at the location shown in the illustration.

  1. Install the No. 1 chain vibration damper with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



    A265771E01
  1. Align the timing marks of the camshaft and crankshaft with the mark plates of the timing chain sub-assembly and install the timing chain sub-assembly.
    Text in Illustration 
    *a
    Timing Mark
    *b
    Timing Mark (Rectangle)
    *c
    Mark (Circle)
    *d
    Orange Mark Plate
    *e
    Yellow Mark Plate

    HINT:
    1. To prevent the No. 2 camshaft from springing back, turn it using a wrench and set it at the mark on the chain.
    2. There are 3 marks on the camshaft timing sprocket. Make sure to align the mark plate with the timing mark (rectangle).

  1. Install the chain tensioner slipper.

  1. Install the No. 1 chain tensioner assembly with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Remove the hexagon wrench from the No. 1 chain tensioner assembly.



    A267436E01
  1. Turn the crankshaft approximately 20° counterclockwise to set it to TDC. Make sure that the timing marks and mark plates are correctly positioned.
    Text in Illustration 
    *a
    Timing Mark
    *b
    Timing Mark (Rectangle)
    *c
    Mark (Circle)
    *d
    Orange Mark Plate
    *e
    Yellow Mark Plate

    HINT:
    There are 3 marks on the camshaft timing sprocket. Make sure that the timing mark (rectangle) is at the top.



6. INSTALL EXHAUST MANIFOLD
  1. Set a new gasket to the cylinder head sub-assembly.

  1. Temporarily install the exhaust manifold with the 3 bolts and 2 nuts.

  1. Temporarily install the manifold support bracket with the 3 bolts.



    A267694E01
  1. Tighten the exhaust manifold with the 3 bolts and 2 nuts.
    Text in Illustration 
    *1
    Bolt
    *2
    Nut

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

  1. Connect the wire harness clamp and heated oxygen sensor connector.

  1. Remove the 3 bolts and manifold support bracket.



7. INSTALL MANIFOLD SUPPORT BRACKET


    A267692E01
  1. Install the manifold support bracket with the 4 bolts.

    Torque:
    Bolt A:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    Bolt B:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



8. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 1 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



9. INSTALL INTAKE MANIFOLD
  1. Install a new No. 1 intake manifold to head gasket to the intake manifold.

  1. Install the intake manifold insulator with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the ventilation hose.

  1. Temporarily install the intake manifold and intake manifold stay with the 5 bolts and 2 nuts.



    A268526E01
  1. Tighten the intake manifold with the 3 bolts and 2 nuts.
    Text in Illustration 
    *1
    Bolt
    *2
    Nut

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the fuel vapor feed hose and ventilation hose.



    A267685
  1. Connect the 4 wire harness clamps and water by-pass hose.



10. INSTALL INTAKE MANIFOLD STAY
  1. Tighten the intake manifold stay with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



11. INSTALL TIMING CHAIN COVER
(Click here)