Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › HYBRID CONTROL SYSTEM

HYBRID CONTROL SYSTEM > ECU Power Source Circuit

for Preparation Click here


DESCRIPTION

If the power switch is on (IG), the power management control ECU applies current to the MREL terminal to turn the IGCT relay on. This supplies power to the +B1 and +B2 terminals.

WIRING DIAGRAM


A263317E02


INSPECTION PROCEDURE

1.CHECK POWER MANAGEMENT CONTROL ECU (+B1, +B2 VOLTAGE)
  1. Turn the power switch on (IG).



    A252924E03
  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    A39-5 (+B1) - Body ground
    Power switch on (IG)
    11 to 14 V
    A38-2 (+B2) - Body ground
    Power switch on (IG)
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (Power Management Control ECU)

  1. Turn the power switch off.



NG
Go to step 3
OK


2.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)
  1. Disconnect connector G57 and G58 from the power management control ECU.



    A253458E07
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    G57-5 (E01) - Body ground
    Always
    Below 1 Ω
    G57-6 (E1) - Body ground
    Always
    Below 1 Ω
    G58-5 (E02) - Body ground
    Always
    Below 1 Ω

    Text in Illustration 
    *a
    Rear view of wire harness connector
    (to Power Management Control ECU)

  1. Connect the power management control ECU connectors.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

GO TO PROBLEM SYMPTOMS TABLE (Click here)  

3.CHECK POWER MANAGEMENT CONTROL ECU (MREL VOLTAGE)
  1. Turn the power switch on (IG).



    A252924E05
  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    A39-6 (MREL) - Body ground
    Power switch on (IG)
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (Power Management Control ECU)



NG
REPLACE POWER MANAGEMENT CONTROL ECU (Click here)
OK


4.CHECK FUSE (IGCT NO. 2)


    A263634E01
  1. Remove the IGCT NO. 2 fuse from the No. 2 engine room relay block and No. 2 junction block assembly.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    IGCT NO. 2 fuse terminals
    Always
    Below 1 Ω

    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT NO. 2 Fuse

  1. Install the IGCT NO. 2 fuse.



NG
Go to step 11
OK


5.CHECK FUSE (IGCT-MAIN)


    A264124E01
  1. Remove the IGCT-MAIN fuse from the No. 2 engine room relay block and No. 2 junction block assembly.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    IGCT-MAIN fuse terminals
    Always
    Below 1 Ω

    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT-MAIN Fuse

  1. Install the IGCT-MAIN fuse.



NG
Go to step 12
OK


6.INSPECT RELAY (IGCT)
  1. Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.



    A253297E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    Auxiliary battery voltage is not applied between terminals 1 and 2
    10 kΩ or higher
    Auxiliary battery voltage is applied between terminals 1 and 2
    Below 1 Ω

    Text in Illustration 
    *1
    IGCT Relay

  1. Install the IGCT relay.



NG
REPLACE RELAY (IGCT)
OK


7.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)
  1. Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.

  1. Disconnect connector A38 and A39 from the power management control ECU.



  1. Measure the resistance according to the value(s) in the table below.


    A263629E01


    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT Relay
    *a
    Rear view of wire harness connector
    (to Power Management Control ECU)
    -
    -

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A39-5 (+B1) - 5 (IGCT relay)
    Always
    Below 1 Ω
    A38-2 (+B2) - 5 (IGCT relay)
    Always
    Below 1 Ω

  1. Install the IGCT relay.

  1. Connect the power management control ECU connectors.



NG
REPLACE FUSE (IGCT-MAIN)
OK


8.CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)
  1. Remove the IGCT-MAIN fuse from the No. 2 engine room relay block and No. 2 junction block assembly.

  1. Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.



    A263631E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 (IGCT relay) - 2 (IGCT-MAIN fuse)
    Always
    Below 1 Ω

    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT Relay
    *3
    IGCT-MAIN Fuse

  1. Install the IGCT-MAIN fuse.

  1. Install the IGCT relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


9.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)
  1. Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.

  1. Disconnect connector A39 from the power management control ECU.



  1. Measure the resistance according to the value(s) in the table below.


    A263632E01


    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT Relay
    *a
    Rear view of wire harness connector
    (to Power Management Control ECU)
    -
    -

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A39-6 (MREL) - 1 (IGCT relay)
    Always
    Below 1 Ω
    A39-6 (MREL) or 1 (IGCT relay) - Body ground and other terminals
    Always
    10 kΩ or higher

  1. Install the IGCT relay.

  1. Connect the power management control ECU connectors.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


10.CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY - BODY GROUND)
  1. Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.



    A263633E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    2 (IGCT relay) - Body ground
    Always
    Below 1 Ω

    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT Relay

  1. Install the IGCT relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

CHECK FOR INTERMITTENT PROBLEMS (Click here)  

11.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)
  1. Disconnect connector C23 from the shift lever position sensor.

  1. Remove the IGCT NO. 2 fuse from the No. 2 engine room relay block and No. 2 junction block assembly.

  1. Disconnect connectors A38 and A39 from the power management control ECU.



  1. Measure the resistance according to the value(s) in the table below.


    A263635E01


    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT NO. 2 Fuse
    *a
    Rear view of wire harness connector
    (to Power Management Control ECU)
    -
    -

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A39-5 (+B1) or 2 (IGCT NO. 2 fuse) - Body ground and other terminals
    Always
    10 kΩ or higher
    A38-2 (+B2) or 2 (IGCT NO. 2 fuse) - Body ground and other terminals
    Always
    10 kΩ or higher

  1. Install the IGCT NO. 2 fuse.

  1. Connect the shift lever position sensor connector.

  1. Connect the power management control ECU connectors.



NG
Go to step 13
OK

REPLACE FUSE (IGCT NO. 2) 

12.CHECK HARNESS AND CONNECTOR (NO. 2 ENGINE ROOM RELAY BLOCK AND NO. 2 JUNCTION BLOCK ASSEMBLY)


    A263636E01
  1. Remove the IGCT-MAIN fuse, IGCT NO. 2 fuse, IGCT NO. 3 fuse and PCU fuse from the No. 2 engine room relay block and No. 2 junction block assembly.
    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT-MAIN Fuse
    *3
    IGCT NO. 2 Fuse
    *4
    PCU Fuse
    *5
    IGCT NO. 3 Fuse

  1. Remove the IGCT relay from the No. 2 engine room relay block and No. 2 junction block assembly.



    A263631E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 (IGCT relay) or 2 (IGCT-MAIN fuse) - Body ground and other terminals
    Always
    10 kΩ or higher

    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT Relay
    *3
    IGCT-MAIN Fuse



    A263637E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    5 (IGCT relay) or 2 (IGCT NO. 2 fuse) - Body ground and other terminals
    Always
    10 kΩ or higher

    Text in Illustration 
    *1
    No. 2 Engine Room Relay Block and No. 2 Junction Block Assembly
    *2
    IGCT Relay
    *3
    IGCT NO. 2 Fuse

  1. Install the IGCT-MAIN fuse, IGCT NO. 2 fuse, IGCT NO. 3 fuse and PCU fuse.

  1. Install the IGCT relay.



NG
Go to step 14
OK

CHECK FOR INTERMITTENT PROBLEMS (Click here)  

13.REPAIR OR REPLACE HARNESS OR CONNECTOR

NEXT

REPLACE FUSE (IGCT NO. 2) 

14.REPAIR OR REPLACE HARNESS OR CONNECTOR

NEXT

REPLACE FUSE (IGCT-MAIN)