TERMINALS OF ECU
System information · Vehicles built from Nov 2005
| SKID CONTROL ECU |


| Symbols (Terminal No.) |
Terminal Description |
| +BS (A27-1) |
Solenoid valve power supply |
| GND1 (A27-2) |
Skid control ECU ground |
| CANL (A27-5) |
CAN communication line L |
| CANH (A27-6) |
CAN communication line H |
| FL- (A27-8) |
Front LH wheel speed signal input |
| FL+ (A27-9) |
Front LH wheel speed sensor power supply |
| STP (A27-10) |
Stop light switch input |
| RL+ (A27-11) |
Rear LH wheel speed sensor power supply |
| RL- (A27-12) |
Rear LH wheel speed signal input |
| +BM (A27-23) |
Motor relay power supply |
| GND2 (A27-24) |
Actuator pump motor ground |
| IG1 (A27-25) |
ECU power supply |
| SP1 (A27-26) |
Speed signal output for speedometer |
| FR- (A27-30) |
Front RH wheel speed signal input |
| FR+ (A27-31) |
Front RH wheel speed sensor power supply |
| RR+ (A27-33) |
Rear RH wheel speed sensor power supply |
| RR- (A27-34) |
Rear RH wheel speed signal input |
| VGS (A27-28) |
Deceleration sensor power supply |
| GL1 (A27-4) |
Deceleration sensor signal input |
| GGND (A27-7) |
Deceleration sensor ground |
| TS (A27-15) |
Sensor diagnosis check input |
| CHECK SKID CONTROL ECU |


Disconnect the A27 ECU connector.
Measure the voltage and resistance of the wire harness side connector.
If the result is not as specified, there may be a malfunction on the wire harness side.Symbols (Terminal No.)
Wiring Color
Terminal Description
Condition
Specified Condition
+BS (A27-1) - Body ground
W - Body ground
Solenoid valve power supply
Always
10 to 14 V
GND1 (A27-2) - Body ground
W-B - Body ground
Skid control ECU ground
Always
Below 1 Ω
STP (A27-10) - Body ground
L - Body ground
Stop light switch input
Stop light switch ON
Brake pedal depressed
8 to 14 V
STP (A27-10) - Body ground
L - Body ground
Stop light switch input
Stop light switch OFF
Brake pedal released
Below 1.5 V
+BM (A27-23) - Body ground
B - Body ground
Motor relay power supply
Always
10 to 14 V
GND2 (A27-24) - Body ground
W-B - Body ground
Actuator pump motor ground
Always
Below 1 Ω
IG1 (A27-25) - Body ground
L - Body ground
ECU power supply
Ignition switch on (IG)
10 to 14 V
| CHECK INSTRUMENT PANEL JUNCTION BLOCK (MAIN BODY ECU) |


Disconnect the ID junction block connector.
Measure the resistance of the wire harness side connector.
If the result is not as specified, there may be a malfunction on the wire harness side.Symbols (Terminal No.)
Wiring Color
Terminal Description
Condition
Specified Condition
PKB (ID-4) - Body ground
B - Body ground
Parking brake switch input
Parking brake switch ON
Below 1 Ω
PKB (ID-4) - Body ground
B - Body ground
Parking brake switch input
Parking brake switch OFF
10 kΩ or higher
Reconnect the ID junction block connector.
Measure the voltage of the wire harness side connector.
If the result is not as specified, there may be a malfunction in the junction block (ECU).Symbols (Terminal No.)
Wiring Color
Terminal Description
Condition
Specified Condition
PKB (ID-4) - Body ground
B - Body ground
Parking brake switch input
Parking brake switch ON
Below 1 V
PKB (ID-4) - Body ground
B - Body ground
Parking brake switch input
Parking brake switch OFF
10 to 14 V