INSTALLATION
Removal / installation · Vehicles built from Nov 2005
| 1.
INSTALL DIESEL THROTTLE BODY ASSEMBLY |
 |
- Install a new gasket and the diesel throttle body with the 2 nuts and 2 bolts.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
Connect the throttle position sensor connector.
Connect the throttle motor connector.
| 2.
INSTALL NO. 3 AIR HOSE |
 |
- Install the No. 3 air hose to the No. 2 air tube and throttle body.
Tighten the 2 hose clamps.
-
Torque:
- 6.3 N*m{
64 kgf*cm
, 56 in.*lbf
}
| 3.
INSTALL NO. 1 ENGINE UNDER COVER
|
 |
Install the engine under cover with the 12 clips and 4 bolts.
| 4.
INSTALL NO. 1 ENGINE COVER
|
 |
- Attach the 4 clips to install the engine cover.
| 5.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|