2005-2008 RAV4 · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jan 2007


1. INSTALL VACUUM SWITCHING VALVE (for EGR COOLER BY-PASS SWITCHING VALVE)

  1. A110791
    Using a 4mm hexagon socket wrench, install the VSV with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the 2 vacuum hoses.

  1. Connect the VSV connector.


2. INSTALL NO. 1 ENGINE COVER

  1. A123518
    Detach the 4 clips and remove the engine cover.


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
← INSPECTION (from Jan 2007)PARTS LOCATION (from Nov 2005) →