2005-2008 RAV4 · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY

C127459
  1. Install the switch to the manual valve shaft.

  1. Temporarily install the 2 bolts.

  1. C127826
    Install a new lock plate and tighten the manual valve shaft nut.

    Torque:
    6.9 N*m{ 70 kgf*cm , 61 in.*lbf }

  1. Temporarily install the control shaft lever.

  1. C127827E01
    Turn the lever counterclockwise until it stops, and then turn it clockwise 2 notches.

  1. Remove the control shaft lever.

  1. C127828E01
    Align the groove with neutral basic line.

  1. Hold the switch in this position and tighten the 2 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. C127458
    Using a screwdriver, stake the nut with the lock plate.

  1. C127457
    Install the control shaft lever with the washer and nut.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Connect the shift control cable to the control shaft lever with the nut.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

  1. Connect the switch connector.


2. INSTALL BATTERY
  1. Install the battery bracket reinforcement with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the battery carrier with the 4 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the battery tray.

  1. Install the battery with the battery clamp.


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. ADJUST SHIFT LEVER POSITION
  1. Adjust the shift lever position (Click here).


5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the switch (Click here).

← ADJUSTMENT (from Nov 2005)COMPONENTS (from Nov 2005) →