INSTALLATION
Removal / installation · Vehicles built from Nov 2005
| 1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
![]() ![]() |
Install the switch to the manual valve shaft.
Temporarily install the 2 bolts.
Install a new lock washer and tighten the manual valve shaft nut.

- Torque:
- 6.9 N*m{ 70 kgf*cm , 61 in.*lbf }
Temporarily install the control shaft lever.
Turn the lever counterclockwise until it stops, and then turn it clockwise 2 notches.

Remove the control shaft lever.
Align the groove with neutral basic line.

Hold the switch in this position and tighten the 2 bolts.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
Using a screwdriver, stake the nut with the lock washer.

Install the control shaft lever with the washer and nut.

- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
Connect the shift control cable to the control shaft lever with the nut.
- Torque:
- 15 N*m{ 153 kgf*cm , 11 ft.*lbf }
Connect the switch connector.
| 2. INSTALL BATTERY |
Install the battery bracket reinforcement with the 2 bolts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Install the battery carrier with the 4 bolts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Install the battery tray.
Install the battery with the battery clamp.
- Torque:
- 8.5 N*m{ 87 kgf*cm , 75 in.*lbf } for bolt
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf } for nut
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. ADJUST SHIFT LEVER POSITION |
Adjust the shift lever position (Click here).
| 5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Inspect the switch (Click here).

