2005-2008 RAV4 · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY

C127459
  1. Install the switch to the manual valve shaft.

  1. Temporarily install the 2 bolts.

  1. C127826
    Install a new lock washer and tighten the manual valve shaft nut.

    Torque:
    6.9 N*m{ 70 kgf*cm , 61 in.*lbf }

  1. Temporarily install the control shaft lever.

  1. C127827E01
    Turn the lever counterclockwise until it stops, and then turn it clockwise 2 notches.

  1. Remove the control shaft lever.

  1. C127828E01
    Align the groove with neutral basic line.

  1. Hold the switch in this position and tighten the 2 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. C127458
    Using a screwdriver, stake the nut with the lock washer.

  1. C127457
    Install the control shaft lever with the washer and nut.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Connect the shift control cable to the control shaft lever with the nut.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

  1. Connect the switch connector.


2. INSTALL BATTERY
  1. Install the battery bracket reinforcement with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the battery carrier with the 4 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the battery tray.

  1. Install the battery with the battery clamp.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf } for bolt
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf } for nut


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. ADJUST SHIFT LEVER POSITION
  1. Adjust the shift lever position (Click here).


5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the switch (Click here).

← ADJUSTMENT (from Nov 2005)COMPONENTS (from Nov 2005) →